Lateral Upgrade

Client
Project Type

Electrical, Fire and ECO

Hackney Lateral Upgrade

About The Project

Point of Contact

Paul Bywaters

Project Value

£43,335

Programme

4 Weeks

Lateral Upgrade

Location

London N1

 

Scope of Work:

  • LED lighting + Emergency to intake cupboard
  • Surge Protection
  • Fused Main Isolator installation
  • Lateral Mains to each flat
  • Rec 2 isolator in each flat
  • New Communal Gas and Dry Riser bonding to landlords areas
  • New intakes installed
  • Main Earth Bar protection
  • Galvanised Containment with security screw no turn buckle
  • LSF single core cables installed
  • Riser Trunking
  • Earth tagging on trunking and bonds
  • Fire Pillows installed

Challenges:

  • No main earth to property.
  • Anti-social behaviour
  • Fuses in existing Ryefield burning out
  • Light fitting in electrical intake smashed

Results:

  • Completely contained installation which can only be accessed by security tools
  • Intake braced off of wall with Unistrut to ensure any future water leaks do not damage equipment.
  • New main cables to head and throughout the block
  • All cables LSF, All penetrations fire protected with Fire pillows and Fire Sealent
  • All new distribution equipment
  • Main Earths protected inside trunking, gas and dry riser bonds hidden at high level to remove the risk of theft
Electrical CB Services
Fire Prevention
Compliance CB Services Group

Accreditations

Contact Us